Scenario planner

Workforce & Cost Scenario Planner

Model how demand, workload, automation, productivity, shrinkage and labour cost assumptions flow through to FTE, forecast spend, budget variance and operational risk. This is one example of the practical planning models I build to connect operational drivers with Finance targets and transformation assumptions.

Step 1

Choose scenario

Pick a starting point. The assumptions and impact update immediately.

Selected scenario

Baseline scenario

Baseline assumes no change from the current or prior-year baseline.

Step 2

See what changed from Baseline

Baseline is the reference case for the example model.

Baseline
Workload 0.0% Same workload hours
FTE required 0.0% Same FTE requirement
Annual labour cost 0.0% Same annual cost
Main driver Base Use this as the reference point
Step 3

Review executive metrics

Use these numbers to understand workload, capacity and budget impact in one look.

Workload hours / week 3,567 27,500 effective tasks / week
Paid hours required / week 4,573 1,006 non-productive paid hrs
FTE required 120.3 38.0 paid hrs / FTE / week
Current FTE variance -0.7 FTE Within current capacity
Forecast labour cost $11.56M $963k monthly run-rate
Forecast vs approved budget +$557,778 +5.1% vs approved

Executive summary

Scenario readout

This scenario requires 120.3 FTE, which is 0.7 FTE below current capacity. Forecast labour cost is $11.56M, which is $558k above approved budget.

Capacity check

0.7 FTE spare
Current capacity 121.0 FTE
FTE required 120.3 FTE

Budget check

$558k above approved budget
Approved budget $11.00M
Forecast labour cost $11.56M
Step 4

Adjust assumptions

Change the inputs only when you want to test a different version of the scenario.

Australian FY
Discuss this scenario

Baseline vs scenario

Compares the selected scenario to the editable baseline assumptions
Baseline FTE 120.3
Scenario FTE 120.3
FTE change +0.0 FTE
Baseline labour cost $11.56M
Scenario labour cost $11.56M
Cost change +$0
Budget variance +$557,778
Risk level Lower

Weekly workload inputs

Channel volumes, AHT and labour rates
Channel Weekly volume AHT mins Hourly labour cost Effective volume Workload hrs Paid hours required / week FTE Annual labour cost
Step 5 Check risks and ownership Use the chart, insights and governance view before acting on the number.

Annual labour cost by channel

Paid hours x hourly labour cost

Planning insights

4 insights

Budget view

Australian FY
Monthly run-rate $963,148
Quarterly run-rate $2,889,444
Approved annual budget $11,000,000
Remaining FY forecast $963,148

Monthly benefit phasing

Shows how the scenario benefit lands across the Australian FY

Planned benefit vs actual benefit

Placeholder for tracking once a plan is live
Planned benefit $0
Actual benefit $0
Variance $0
Status Not tracked yet

Risk flags

0 flags

Sign-off and ownership

Simple governance view for assumption control
Demand assumption owner Operations
Productivity assumption owner Operations / WFM
Automation benefit owner Transformation
Finance sign-off Finance
Operations sign-off Operations
Budget owner final sign-off Budget owner

Calculation logic

Workload hours = Volume × AHT / 60. Paid hours required = Workload hours / (1 - shrinkage). FTE required = Paid hours required / paid hours per FTE per week. Annual labour cost = Paid hours required × hourly labour cost × 52.